Hospitality 2023 · Delivered

Bar de la Plage

A seafront bar where light, rhythm and materiality carry the atmosphere.

Scroll

Project facts

Location
Nice Côte d’Azur
Year
2023
Status
Delivered
Role & scope
Selected professional experience

The brief

A bar in the middle of a terminal, with nothing to hide behind

A freestanding bar in the departure hall at Nice, under a fully glazed façade and a black technical ceiling. No walls, no back, no dark corner: the unit is seen from every angle, from the floor and from the level above.

The brief asked for the Mediterranean, a seafront bar in an airport, without a single decorative cliché, and with a footprint that could not obstruct sightlines to the gates.

Concept

A woven canopy, and a bar with no back

Since the unit has no façade, the ceiling does the work. A woven timber canopy floats above the whole bar: dense enough to read as a roof and give the space beneath it a scale, open enough to keep the terminal’s glazing and daylight visible through it.

Beneath it, the bar is designed to be finished on all four sides, a continuous counter in warm timber with a yellow ceramic base, an open back-bar with bottles lit from within, and planting in terracotta at the perimeter that marks the edge without closing it.

Bar de la Plage, the back bar under the canopy
The back-bar and the sign, seen through the canopy

Freestanding, the bar has no façade. The ceiling has to do the work.

BEDI DESIGN
Bar de la Plage, the woven canopy seen from the mezzanineBar de la Plage, the canopy structure and the planted edge
The unit seen from the level above, and the canopy structure at the planted edge

What this covered

Concept development through to opening, inside an operating terminal.

  1. Concept development

    The canopy and the four-sided bar, developed from the brief to a buildable design.

  2. Canopy engineering coordination

    Weight, fixings and fire performance resolved with the structure and the airport.

  3. Bar and back-bar joinery

    Counter, base and service side drawn around the operator’s sequence.

  4. FF&E and planting

    Stools, tables, terracotta and planting scheduled and tracked to the opening.

  5. Airport compliance and site

    Access, night works, evacuation clearances and snagging through to handover.

Delivery

Assembled in the terminal, between two flights

Everything was brought airside in pieces, escorted, and assembled at night. The canopy was prefabricated in sections sized by the service lift and the doors, then jointed in place, the reason its geometry is repetitive rather than continuous.

Evacuation clearances around the unit were checked with the airport at each stage, and the planted perimeter was set to the line they fixed.

The bar in four views

Work with us

Every project begins with a conversation

Tell us about the place, its context and your ambitions. We reply within two working days.

Start a project