Workplace Delivered

Emissive

A workplace shaped around how the teams actually move through the day, from first brief to handover.

Scroll

Project facts

Location
Rue de Metz
Status
Delivered
Role & scope
BEDI DESIGN: Full-scope

The brief

A studio that had outgrown its own floor

A growing team on a floor laid out for a smaller one: desks added wherever they fitted, meetings held in the only enclosed room, and nowhere at all to stop working for ten minutes.

The brief was not to add square metres, there were none to add, but to find out how the teams actually move through a day, and to lay the floor out around that.

Concept

Work, meet, retreat, laid out as a route

The floor is organised as a sequence rather than a grid. The entrance opens onto a lounge that absorbs arrivals and informal conversations; the open workspace sits behind it, held by storage walls that double as acoustic screens; meeting rooms and the break room close the far end, where interruption costs least.

Glazed partitions keep the daylight travelling across the whole depth, and the graphic film on them gives privacy without turning the rooms into boxes.

Emissive, the entrance lounge on the upper floor
The entrance lounge, placed to absorb arrivals before the open floor

A workplace is planned in minutes, not square metres.

BEDI DESIGN
Emissive, the cafeteria and its standing tablesEmissive, the main meeting room
The cafeteria and the main meeting room, at the quiet end of the floor

What we handled

Full scope, from the workplace survey through to handover.

  1. Workplace survey

    How the teams actually use the floor across a week, before any line was drawn.

  2. Space planning and zoning

    The route from entrance to break room, and the densities each zone can carry.

  3. Joinery and storage

    Storage walls drawn as acoustic screens, so one element does two jobs.

  4. Acoustics and lighting

    Treatment and circuits developed together, zone by zone.

  5. Site coordination

    Phasing, trade coordination and snagging through to handover.

Delivery

Phased around a team that kept working

The floor stayed occupied throughout. The work was cut into phases that each freed one zone at a time, with the storage walls installed first so the open floor could be screened while the rooms behind it were built.

The partitions were set out on site against the existing structure rather than off the drawing, the building does not offer a square grid, and glazed partitions are unforgiving of the difference.

The floor, room by room

Work with us

Every project begins with a conversation

Tell us about the place, its context and your ambitions. We reply within two working days.

Start a project